If a construction project requires a SROA permit, the contractors, general and subs or specialty, must be registered with SROA and on the Registered Contractor List.

If you are a contractor registering for the first time:
  • Complete and pass a Contractor Q & A Form: The questions asked are based on information contained in specific sections of the Design Committee Manual of Rules and Procedures.
  • Contractors are listed by category and may appear in up to four categories
  • Depending on scope of work, an Oregon CCB number may be required to register and/or perform work within Sunriver

Inclusion in the list does no imply endorsement or recommendation by SROA


 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer